oil platform montage
AVEVA Marine

AVEVA Pipe Stress Interface 11.6

Integrates pipe stress analysis with AVEVA Outfitting.

Analysing piping designs to check stresses and to design the supports is a specialist job. Developed in response to feedback from customers, AVEVA Pipe Stress Interface provides an interactive and intuitive method of specifying a stress network and delivers major savings by automating the two-way flow of information between Outfitting designers and stress analysts.

Business Benefits

  • Better piping workflow, with reduced man-hours and schedule time
  • Time savings in excess of 50% are achievable
  • Quick and easy to adopt. Savings can be made immediately

Key Features

  • Two-way interactive interface between AVEVA Outfitting and Coade's CAESAR II, [v4.50 or 5.00]
  • Visualisation of pipeline deflections.
  • Suggested routes can be clash-checked quickly
    within the 3D model, reducing design iterations.
  • Supports are transferred between AVEVA Outfitting
    and the pipe stress system.
  • Customisation facilities allow the re-use
    of existing catalogue data.
  • User configurable to suit a company's working methods

AVEVA Pipe Stress Interface's architecture is designed to allow future interfaces between Outfitting and other pipe stress systems.

   

Screen image of calculated pipe deflection
Clear visualisation of pipe deflection

How it works

  1. AVEVA Pipe Stress Interface can be used at all stages from initial layout to final detailed design.
  2. The pipe stress system is selected from pipe branches in Outfitting.
  3. Pipe properties such as weights and wall thicknesses may be obtained from within the Outfitting project or from an external source.
  4. Data is transferred to CAESAR II via an intermediate file. The user can modify the order in which the stress system will be processed.
  5. Results such as suggested re-routes, support loads and displacements, may be transferred back to Outfitting for further use.
  6. Design work, such as clash checking, pipe routing and support design, is completed in Outfitting.
Download brochure (200kB pdf)


Download the
AVEVA Pipe Stress Interface brochure.
(200kB pdf)

Return to AVEVA Marine Product List

Mail this page

Back to Top

Home

23 July 2008
11 July 2008
Current share price:
Available Shortly  
  -  
» Detailed Share Price
» Regulatory News