oil platform montage
aveva plant

AVEVA Final Designer

The only AutoCAD-based application designed specifically
to work seamlessly with AVEVA PDMS

For an EPC contractor, creating, modifying and maintaining drawings to different customers' specifications can be both involved and time consuming. AVEVA Final Designer is an AutoCAD-based application that enables quick definition of styles and formats, and efficient production of drawings from the AVEVA PDMS model.

Business Benefits

  • More efficient working
    Customer drawing formats are easy to set up.
    Drawing creation and management are made easier.
  • Easy to adopt
    Requires minimal training.
    Large skill base of AutoCAD professionals.

Key Features

  • Integrated with PDMS drawing production
    AVEVA Final Designer combines an industry-standard drafting solution with the integrity and quality of the PDMS plant model and its highly automated drawing production capabilities.
  • Ease of use
    A PDMS drawing is exported to Final Designer using a simple menu option or command input. All subsequent work on the drawing is then completed using Final Designer within the AutoCAD environment. Copies of a drawing can be exported in the industry standard DWG format at any time.
  • Design integrity
    3D views are generated by PDMS Draft to reflect any changes made to the 3D model. All drawing enhancements, such as dimensioning, labelling, 2D drafting or additional view creation, are performed in Final Designer. Any subsequent design changes to the PDMS model will be automatically reflected in the Final Designer AutoCAD drawings. Previous annotations connected to PDMS 3D elements will be updated under control, to reflect the up-to-date model.
  • Supports global working
    Controlled distribution of drawings to diverse locations can be carried out with AVEVA Global.
     Click for larger image

A PDMS model...

Click for larger image ...and its Final Designer drawing

Download the  
AVEVA Final Designer brochure  
(250kB pdf)  

Download brochure (250kB pdf)

Return to AVEVA Plant Product List

Mail this page

Back to Top

Home

23 June 2008
17 June 2008
Current share price:
Available Shortly  
  -  
» Detailed Share Price
» Regulatory News