- AVEVA PDMS is designed to support large teams of designers working together in a controlled and managed way. It has sophisticated and highly configurable access and change control tools to allow the system to be tailored for an enormous variety of engineering work practices and project situations.
- Work breakdown structures can be changed in line with the evolving project needs; for example, to adapt to changes when construction contracts are awarded.
Clear change highlighting
|
|
PDMS 12 and AVEVA Global make collaborative working easy
- Now even more closely integrated with AVEVA Global, the power of AVEVA PDMS 12 can be used collaboratively by distributed project teams around the globe.
- Session management capabilities enable roll-back to any previous project configuration. This is possible because the PDMS model database grows by adding layers of data, from each session, that record the parts of the model changed during the session. This also means that the full change history of any part of the model can be shown.
- Change highlighting facilities mean that modelling and drawing changes from a previous version, or from a specific date and time in the past, can be displayed on screen or in drawings in highlighted colours. Reports of changes can also be created.
|