Presentation: ENEL: Powering the 2026 Winter Games with AVEVA PI System

2026 - AVEVA World - Milan - General interest

ENEL: Powering the 2026 Winter Games with AVEVA PI System

For AI live translation click here. ENEL shares how it utilized AVEVA PI System to support energy distribution and generation for the 2026 Winter Games. The project includes real-time monitoring of medium- and low-voltage grids and an automated backup and restore system to optimize storage and reduce data center costs. Learn how ENEL applied data-driven strategies to ensure reliability, resilience, and operational efficiency for one of the world’s most high-profile events.


Industry

Power and Utilities


Company

Enel

Speaker

Luca Franceschini

NA


Company

Enel

Speaker

Federica Pelella

NA


Company

e-matica srl

Speaker

Giuseppe di Bartolo

NA