Adani Transmission Limited

To meet India’s growing appetite for electricity, Adani was charged with constructing an interstate high-voltage transmission line that would require hundreds of towers. To get the job done, Adani chose AVEVA to accelerate the design, manufacture, and construction process—reducing the time to generate new drawings by 40%.