AVEVA PDMS is gradually being phased out and will be removed from the market by 2024 when it will be replaced with our latest, most advanced design tool ever – AVEVATM E3D Design. As part of our continual drive to ensure you have access to industry-leading solutions, AVEVA E3D Design offers a more powerful and efficient way of working, and is available on our secure cloud platform, AVEVATM Connect.
We offer full migration support to ensure minimal disruption to projects and the assurance that your data is secure, so your engineering teams can collaborate with full transparency at every stage of a project. Save time by up to 50% on project start-up and expect lower IT costs when you make the transition to AVEVA E3D Design.
Migration from AVEVA PDMS to AVEVA E3D Design

Plant design has come a long way since the launch of AVEVA PDMS in 1976. Discover how with our interactive timeline.

Compared with other systems available today, AVEVA E3D Design Customers tell us that it enables their project teams to save 30%

Want to know more? Watch our on-demand webinar to see how AVEVA E3D Design stacks up against PDMS on a feature by feature basis.
Success Accelerators
When you’re ready to make the move, we will work hand-in-hand with you to transfer all of your data stored on AVEVA PDMS to the new platform and to ensure you and your team have the know-how to make the most of AVEVA E3D Design.