2024 - AVEVA World - Paris - Power & Utilities
A2A SPA: Virtual Control Room
The Virtual Control Room is a project realized by A2A in collaboration with Factory Software and Alten to manage the entire Renewables Power Plants of the company, with the aim of monitoring and controlling the renewable power production of the company. The system is composed of various parts, from OT to IT, and allows real-time and near real-time data availability and usability of data from all plants. It enables operation and remote control, as well as monitoring, by uniting and simplifying the work of the remote control operators and asset managers, who are more focused on analysis and problem-solving. For each plant, both photovoltaic and wind, operators can monitor production, efficiency, availability and downtime, as well as detect anomalies and trends or situations that need to be managed such as parameters that deviate from expected range. The virtual control room platform has been implemented on the AVEVA System Platform (UOC) and currently manages about a hundred photovoltaic and wind plants, retrieving thousands of tags from the field. It is designed to support all future growth and additional renewable plants.
Industry
Power and Utilities
Company
A2A S.P.A.
Speaker
Davide Zanetti
Digital Generation and Trading Dept. Manger, 14 years working in the Digital, since the beginning of my career. In the role since late 2022, leading a team of 13 people.
Company
A2A S.p.a
Speaker
Maurizio Savasta
I work as IT/OT Integration and Automation Engineer, managing projects related to the provision of supervisory control and data acquisition platforms (SCADA/DCS) in according to enterprise infrastructure standards and IT/OT secure policies provide by Group Security team.
Company
A2A
Speaker
Lorenzo Gianoli
I hold a degree in Energy Engineering and, for the past three years, I have been working at A2A in the field of IT systems for power generation. My role involves overseeing the integration, maintenance, and optimization of these systems.
Session Code
AW24-PAU-D1-SESS-232
Transcript
Thank you, Fiona, for the introduction.
My name is, David Ezanetti, and I am the digital generation and trading department manager of, eight way.
Today with me, there is also, Maurizio, Sebastian, who who are respectively the IT project manager and OT project manager of the virtual control room project, we are going to see, in details later.
Let me now give you a brief presentation of our company, a two a.
A two a is a life company because we manage all the commodities at the basis of the life, such as power, gas, heat, water, and waste. And, our mission is to put life at the heart of everything we do for us and for future generations.
Our infrastructures serve services and, plants serve people and protect the nature, and we are really committed to enhance our presence and to build a strong relationship with our stakeholders, such as, communities, customers, and the councils and governments.
Having a look of our, strategic plan, it's a long term plan, from twenty twenty four to twenty thirty five, in which in this time span, we, aim to invest several billions in several sectors, such as electric networks, renewable energy, of course, because the virtual control room project that we are going to see today is a project, about renewables, energy recovery, material recovery, water cycle, and the district heating.
As you can see in this picture, our strategy, our vision is based on two main pillars, the energy transition and the circular economy. As energy transition, we promote energy by renewables in order to accelerate the decarbonization through the electrification of the consumptions.
And, of course, as a circular economy, we mean, turning waste into some other materials, valuable materials such as energy and power. And we do it investing in advanced waste management systems to reduce the landfill waste and to transform what also we have considered as trash.
Moreover, we are active also in the water cycle management.
We are committed to build a a virtuous water cycle, and we do it investing in, innovative water cycle management systems in order to save every drop and to use the water efficiently and in a more sustainable way.
Where we are, we are present in the whole country of Italy, with plant and services, and, especially in the north where we have our capitals, the city of Milan and Brescia.
And, it is where the company has been founded several years ago.
In conclusion, we can say that, we are committed to making an impact for the future, and our initiatives from now and beyond are really designed to, build a better world and a more sustainable world.
So now it's time to go to see the the project, the virtual control room project, that is one of our main project in our strategic path.
And, it is designed to implement a unique tool, a unique system and platform to manage the whole, fleet of renewal plants that we have in our company. So I leave the speech to Lorenzo, and thank you for your attention.
So thank you, David.
We can start seeing, why we decided to start this, this new project.
And the driving force behind the project, we can say that is, the fragmented nature of power generation from renewable energy, across Italy that we have in our day.
In fact, if we if we go to the past, we can see that the power generation, came from a small number of large scale, power plants that were also supervised by human.
While today, power generation come from, many more plants that produce a less amount of energy each plant.
And these plants are are are also not supervised by human.
So, in addition to this, if you consider that, these renewable power power plants come from, different, several external company, that a two a acquired, You can imagine that before developing our virtual control room, we had in place, different, multiple monitoring system, each covering only a subset of a two way, fleet.
And, you as you can easily understand, this made, operational and management cost for the plants quite high.
So, this is why we conceived the idea of realizing a unique money monitoring tool, capable of overseeing, all the plans, so solar, wind, and potentially also battery storage.
And another requirement was also, the ability for the system, to control automatically or manual, from remote, so remote control, the plans.
So, also, in this case, we proceeded from multiple system controlling our plans, reducing it into one single system.
So the the project was, quite complex, and so, the, EIS manager, that is responsible, for management managing the entire, fleet renewable fleet of a two a, engaged us, so the IT and OT, digital department, in order to to develop the the the the platform.
So, we needed a strong collaboration with, the IIS managers, of course, but also with the operational excellence, function, that helped us, managing, the asset managers.
And, of course, we also had to, collaborate with digital, infrastructure, architecture, and cybersecurity, in order to, assure that, the hardware policies and standards, were respected.
Of course, we needed also the support of, our supplier, so factory software, with Alten.
And last but not least, I have to mention a two way smart city, that was fundamental for us to, analyze and establishing, a centralized connectivity from the plants to the data center.
So, in this slide, I can give you, an idea, for the preparatory activities, before implementing the system, that led us from a quick win data centralization till, the implementation in twenty twenty three.
So, as you can imagine, in the first part of twenty twenty two, we we had to start collaborating with the, business function that I have mentioned before, in order to collect, the state of the art, of plans and so understand, their data acquisition, monitoring system, and also the state of the connectivity.
We also needed to collect business requirements in order to better understand what kind of platform they they would like to implement.
And also and also, we engaged the, the digital infrastructure and security, to get, that kind of, requirements.
This allowed us to, prepare, to prepare scouting.
And after the sky scouting, we picked out a supplier shortlist, that allowed us to to start and conclude the tender, at the end of, twenty twenty two.
The twenty twenty three instead was the year of implementation.
That means the virtual control room, the setup of a physical control room, site inspection, on on the plans, in order to guarantee field integration.
We implemented the ticketing system, and, also, we started, integrating our platform, into the company's, ecosystem application ecosystem.
So, if I go to the next slide, you can see more in details, this stream that I have mentioned.
So, virtual control room, power plant connection, physical control room, ticketing and process integration, And you can see that we started with virtual control room at the beginning of twenty twenty three. And, after the second quarter, we managed to, deliver the monitoring system.
Meanwhile, we also introduced the IT production environment, of course, and this allowed us to, to dev to to give and introduce also remote control functionality and, KPI analytics three to four months later.
And by the end of the year, we also introduced some, graphical improvements and feature refinements.
Power plant connection, started with the first power plant connected after the second quarter, and this was crucial for us in order to allow, the the development of the control room for stream, and then we proceeded in waves.
You can see that this stream, is ongoing.
And here, this is due to the fact that, Adria continues acquiring and building new power plants.
And so, this means that we will have to, keep on integrating, the the plants into our platform.
Physical control room maybe was the the easiest part and is completed, in the second quarter of twenty twenty four.
And and then we can go to the to the last stream, and mention the fact that our system is already integrated with the production planning management system.
And this was due to the fact that we needed, to automate, control workflows.
And then you you can see also this stream is ongoing, and we are going to collect to connect, our control room with the meter data management system, and by the end of the year, also with the IT, generation data platform.
Okay. But now I give the floor to to Maurizio, that give you a deeper view of the platform and the technology.
Thanks, Lorenzo, and good evening to everybody.
The philosophy for which the Voucier was build is based on a unified operation center. It means that through the Voucier, it is possible to monitor a different type of information, asset, and KPI, and it is it is possible to also to send a remote command in order to limit the power of a plant.
Moreover, we can performing, geo referencing asset, minus management, reporting, dashboarding, and moreover, it is performed also the integration with a two way, say, good policy, how we will see after.
So I was saying before, the show has different type of information asset and KPI. For instance, high yearly level KPI, typically used by our, IIS managers such as plant availability, plant efficiency, energy, and power producer that can be used to extract economic information or to build the high yearly level report. But the show also low level asset and low level information that, can be used by our operator, such as the state of the inverter, the state of the turbine, if for instance, a turbine has a particular failure, the state of the alarm and, hands on. Before going, to vertical on the Wusier architecture, it is, necessary to do an important consideration because Wusier represent a tangible example of the meeting between digital world and operational technology world.
Two world that takes place in a recent year when we talk about industrial automation, industrial network, cybersecurity are more and more close together. And following this vision, the was built. From an architectural point of view, in according to ETOT's secure policy provides by our group security team, a segmented infrastructure that allow us to acquire the information from the field was built. What does it mean?
It means that each platform that compose the whole infrastructure for platform wind end, Historian, GR node, terminal server, iOS server can talk to each other and to the field by using specific TCP port and by using specific socket communication port. In this way, the Vocera allow real time data acquisition from the field, but allow also to manage the remote control of the power limitation, especially on those plant that could receive power limitation from Terna. Terna for the Italian country represent the TSO, transport system operator. Moreover, if for instance, a particular failure does occur in a plant, it is possible to open a ticket by using the busier direct or by using a specific app that is installed on the smartphone in order to trace on real time the state of the failure, the state of the o and m work.
And, obviously, it is possible to close it, when the failure is fixed. This is an important functionality because in the future, if we will want to collect this information, in order to build an input for a machine learning algorithm, it will be possible to define a predictive maintenance model. This is the idea.
I want to do another consideration because usually we think that the end of the project that does occur or does happens when the operator or the asset management can work on the platform independently. But this is not true. Because, the end of the project does happen, does occur when the continuity of the service was guaranteed. The continuity of the function of the whole infrastructure was guaranteed. To do this, thanks to the support of our infrastructure cybersecurity colleague, an operational mode that allow us to monitor the state of each virtual machine that compose the whole infrastructure was built. It means that it is possible to monitor which service are running in each virtual machine.
If, for instance, a memory of a service exceed a specific threshold, in this case, could be necessary to perform a distribution of the computational load of the service, for instance, an appendage, it is possible to monitor also the occupancy disk of each virtual machine. This is the the idea. This is a vertical overview regarding, specifically a specific wind plant in which, it is possible to observe starting to the half the number of the turbine, in this case, forty three, some information about energy and power produced, some information about, plant efficiency, plant availability, some information about atmospheric parameter, pressure, temperature of the atmospheric, and, going, the green light represent the correct communication between, the the field with respect to our data center.
And moreover, it is possible to observe that this specify the protocol communication that allow us to acquire the information from the field. Going to down, it is possible to observe, the state of each virtual machine the state of each turbine, in this case, run, warning, alarm because a particular failure does occur in a plant. On the left on the right. Sorry.
It is possible to observe a graph between, the energy produced by the plant with respect to the wind speed. Moreover, the step behavior represent the power limitation sent by Terna in the specific plant.
This is another vertical overview regarding, wind turbine in which it is possible to observe the state of it, some information about the daily energy and power produced, some information about the mechanical parts such as the speed generator, the rotor speed, the the concatenate voltage and current, the power curve, and a graph between the daily energy produced with respect to the wind speed.
This is another vertical overview in which we want to highlight the state of each turbine and the active reactive power produced with respect to the wind speed.
This is also, this is instead a list of the photovoltaic plant. For each one, it is possible to observe the state of the inverter. If for instance inverter is a run, stop, or alarm, some information about the energy producer, the radiation, the performance ratio, and so on.
This other image that show us some information about the mechanical part.
Thank you.
In conclusion, we can say that, the challenges brought by the renewables were different.
And, this metamorphosis and transformation, big transformation of the energy production paradigm, We were passing from few plants to many plants, and the complexity to manage had to be addressed. We identified the solution, the unified operation center of Aviva that helped us to streamline the data collection, so to collect the data from the field in real time and, to access the data and to have, the conduction of our plans.
As a result, now we have a unique real time monitoring tool, and we have centralized the information and simplified our processes.
And, a big achieved result is that we have increased our company's scalability. So we are faster and we are more reactive to the market changes. So when we acquire new plants, new, new company that had plants or we build them, we are really fast to integrate in our platform.
And as last, we have a unique database. So, we can start to think about some machine learning algorithm in order to, get insight from the data from maintenance, predictive maintenance, or maybe also the prediction of the and forecast our production, renewable production. So we have finished our presentation, and, we are willing to answer to any question, if you have. And thank you very much for your attention.