Planning & Scheduling Automation (with Manual Overrides)
Start with manual scheduling, or capture your production constraints and policies in the system to automate the schedule generation process.
Once you have the data you need, you can create schedules in seconds not hours. This frees your planners to use their experience to improve the business and make the tough decisions that only humans can make.
Planners can override resource assignments, sequences and priorities if needed, achieving the perfect balance between automation and expert control.

Flexible, Multi-Factor Optimization
With easy to use PlanetTogether Optimization “sliders”, you have the flexibility to take several competing goals into account simultaneously.
Drive production batching efficiencies while also prioritizing important orders and hitting ship dates.
You can easily experiment too, seeing the impact of production management policies on projected inventory, on-time delivery, cash flow, and even custom metrics.
Precise Impact Analysis
Do you make decisions such as order expedites with limited information about downstream impacts? Pull one order in and five more push late.
With PlanetTogether you’ll know in seconds exactly which orders will be affected and by how much.
Better information will translate to better decisions for your business.

Specifications
Type
Software
Optimized Scenario
Make to order manufacturers looking to improve on-time deliver and increase production plan visibility.
Available on
PC
Cloud
Languages
English
English GB
French
German
Spanish
Portugese
Chinese (Simplified)
Chinese PRC
Italian
Japanese
Dutch
Indonesian
Polish
Turkish
Product Template
Application Offering for Software and SaaS
System Requirements
Microsoft SQL Server
Windows Operating System

The PlanetTogether Advanced Planning and Scheduling (APS) platform provides company-wide production schedule visibility that is validated for material feasibility and capacity bottlenecks. It streamlines the production scheduling function, reduces risk of production disruptions due to material shortages, and enables your customer service teams to provide rapid response to schedule related customer requests. Automated schedule optimization prioritizes work for maximum on-time delivery and improves throughput by avoiding excessive setups. With PlanetTogether you respond with agility, operate efficiently and ship on time.
Related Products
Production Scheduling Software
Enable Industry 4.0 with Simio's Forward Looking Digital Twin solution that produces a detailed production schedule and connects to the AVEVA Manufacturing Execution System to react to changes on the factory floor.
AVEVA™ Unified Supply Chain - Plan
Easily build, share, optimize and maintain planning models for refining, petrochemicals and mining, minerals, and metals operations.
AVEVA Manufacturing Execution System
Formerly Known As Wonderware MES
Maximize profitability, flexibility, quality, and compliance in manufacturing by digitally managing the rules and information for all operational activities and plant events in real-time. A work process-centric and Model-driven approach reduce the time to value and cost of ownership for both plant deployments and multi-site MES rollouts.
AVEVA Process Simulation
Formerly Known As SimCentral Simulation Platform
Design sustainable processes, products, and plants at the speed the market demands. AVEVA Process Simulation moves beyond linear, wasteful workflows to enable a circular, sustainable world.
AVEVA System Platform, formerly Wonderware
Contextualize operations with responsive, standards-driven, and scalable software for deploying advanced SCADA, MES, and IIoT. Unify people, processes, and assets.
Related Services
MES Systems Services
Full services to implement optimized production processes, interfacing management systems and production lines while ensuring efficient operations and processes.
Requirements Definition - MES or Automation with ROI
Determining an overall roadmap and vision plan for automation and information systems is critical to the project approval and design. We will quickly understand the business problem, define requirements and demonstrate positive ROI.
EVANS Control Room Expertise Services
Manufacturer of control room consoles, technical furniture, and security rooms. Discover your next console and control room solutions with Evans.
APEX Expertise Services
Enabling manufacturers to deliver on their brand promise. Working collaboratively to understand the culture. Bringing best fit solutions to the table. Our team is ready.
MES for Food Producers Solution Practice
Prebuilt and configurable solution for Order Management, Recipe Management and Batch Execution that provides producers more flexibility and better quality control on their production processes.